Remove KPIs
Explanation
The Remove KPI from Plan activity is used to remove KPIs directly added
to the sustainability plan. Linked KPIs associated with the main KPI cannot
be removed individually.
Prerequisites
- Plan Status: The plan must be in "Preliminary" status.
- User Access: The user must have “Full Access” to the plan.
System Effects
As a result of this activity:
- The main KPI is removed from the plan, along with any linked KPIs
and underlying entity structures, if they exist.