Service resources are
resources which have been defined in IFS/Enterprise/Resource/Resource
Details to be used in Service and Maintenance. The resource types
include persons, person groups, tool/equipment, tool/equipment groups, crew
and crew groups. When specific criteria are met the resources can be entered
on a resource demand line and be assigned to work assignments on a Request
Work Task.
To use a resource in a work
task resource demand or work assignment the following is required in Resource
Details:
Note: In
addition to above:
For a resource of type Person, a
site should be defined in the Site Settings tab in Resource
Details/Maintenance/Service page.
It is allowed to define multiple sites and maintenance organizations. If so,
one site should be set as the Primary site.
To use a resource in a work
task resource demand, the following is required in Resource Details:
To allocate a resource
group in a specific site in MPB, in addition to the prerequisites for
persons group and tools/equipment group which are mentioned above, the
following is needed in the Connections page in Resource
Detail page for the Specific site connection:
If tool tracking is used in
tool/equipment groups, Tool Tracking needs to be set as Track
Check Out/In in the Resource Details/Maintenance/Service page
for the resource groups of type Tool/Equipment.
In general, resource
availability is taken from resource Calendar. There are general flows
of fetching calendar as below.
Availability of Person
Availability of
Tool/Equipment
Availability of Person/Tool
Group
Availability of Crew/Crew
Group
To be able to achieve
correct results in resource allocation there is a pre-requisite to have the
capacity calculated for the resources. Generated capacity calculated for a
resource is a pre-requisite for the following allocation functionalities:
The resource capacity is
calculated based on the resource schedule. If the Use HR Schedule option
is enabled on resource and employee is connected to the resource has an HR
Schedule defined in the Employee File this Schedule is used as the base for
the capacity. If the Use HR Schedule option is disabled then the Work Time
Calendar defined for the resource is the base for the calculated capacity.
The resource capacity is used in the allocation process in Service and
Maintenance to define the working and non-working time for the resources.
To calculate the resource capacity for the resources it is needed to run the Calculate Resource Capacity for the resource structure where the resources is connected to. In Application Base Setup/Enterprise/Resource/Resource Details the option is there as a command button option to Calculate Resource Capacity this calculation can be done for a specific resource or for the full resource structure. In the dialog opened from this option there is also an option to setup a background job to continuously calculate the capacity for a certain structure.