Use this activity to create shipment plans. A shipment plan can be created in two different ways:
Item should have been defined with an inventory part, and item cost/hours calculation and scheduling should have been completed to get the correct quantities and dates.
The same material can be added to several work task plans and shipment plans as long as the total required quantity isn't exceeded. The total required quantity is calculated when item cost/hours calculation and generate schedule are run. The quantity for the same material can be balanced between shipment plans and work task plans, so that it doesn't exceed the total required quantity: