Change Expire Date
Explanation
This activity is used to manage archive size as the system automatically removes outdated report data. Each report archive entry has a configurable expiration date, which can be adjusted manually or through system processes. This prevents excessive data accumulation.
Prerequisites
- The selected report should be an operational report.
- The user should be granted with required Permission sets.
- Required report projections must be included in the granted permission sets.
- Result key of an executed operational report
System Effects
N/A