On this page you will find the specifications regarding the Model: Project and Fact Table: PROJECT HISTORY DETAILS PHD.
This model dimension represents a model specific dimension based on the IFS Cloud fact FACT_PROJECT_HISTORY_LOG. The dimension is based on a fact and there is no corresponding dimension in core.
Attribute | Description (where applicable) |
Earned Value Method | Earned Value Method |
Hist Activity Description | Historical Activity Description |
Hist Short Name | Historical Activity Short Name |
Keyref 1 | Represents the first Key Reference |
Keyref 2 | Represents the second Key Reference |
Keyref 3 | Represents the third Key Reference |
Keyref 4 | Represents the fourth Key Reference |
Keyref 5 | Represents the fifth Key Reference |
Keyref 6 | Represents the sixth Key Reference |
Log Executed | Log Type |
Object Description | Represents the Object Description |
Object Type | Represents the Object Type |
User Comment | Comment |
Element Type | Element Type |
Baseline Revision Number | Baseline Revision |
Fact Project History Details Id | Project History Details ID |
Aggregation of measures is based on SUM if not explicitly noted.
This section describes the basic measures in the cube. These are either measures defined in the core Information Source, in the model itself or in the ETL process. The columns have the following meaning:
Measure | Calculated Y/N | Contains Time Intelligence Y/N | Definition/Note (where applicable) | Aggregation Type | Hidden Y/N | Measure Expression |
Actual Cost Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ACTUAL_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Actuall Rev Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ACTUAL_REV_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Committed Cost Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [COMMITTED_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Estimated Cost Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ESTIMATED_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Estimated Rev Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ESTIMATED_REV_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Planned Committed Cost Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_COMMITTED_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Planned Cost Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Planned Rev Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_REV_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Posted Rev Budget Curr PHD | N | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [POSTED_REV_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Preliminary Rev Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PRELIMINARY_REV_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Used Cost Budget Curr PHD | Y | N | Budget Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [USED_BUDGET] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Actual Cost Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ACTUAL_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Actual Rev Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ACTUAL_REV_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Committed Cost Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [COMMITTED_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Estimated Cost Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ESTIMATED_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Estimated Rev Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ESTIMATED_REV_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Planned Committed Cost Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_COMMITTED_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Planned Cost Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Planned Rev Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_REV_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Posted Rev Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [POSTED_REV_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Preliminary Rev Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PRELIMINARY_REV_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Used Cost Proj Curr PHD | Y | N | Project Currency calculation | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [USED_PROJECT] ), 'REPORTING DATE'[ID] = LastReportingDate ) | |
Actual Cost Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ACTUAL_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Actual Rev Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ACTUAL_REV_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Committed Cost Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [COMMITTED_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Estimated Cost Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ESTIMATED_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Estimated Rev Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ESTIMATED_REV_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Planned Committed Cost Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_COMMITTED_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Planned Cost Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Planned Rev Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_REV_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Posted Rev Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [POSTED_REV_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Preliminary Rev Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PRELIMINARY_REV_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Used Cost Trans Curr PHD | Y | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [USED_TRANSACTION] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Cost Progress % PHD | Y | N | N | IF([Planned Cost Progress Basis PHD] > 0 , [Earned Value Cost Progress Basis PHD]/[Planned Cost Progress Basis PHD], BLANK()) | ||
Cost Progress % RC PHD | Y | Y | Reporting Currency calculation | N | IF([Planned Cost Progress Basis RC PHD] > 0 , [Earned Value Cost Progress Basis RC PHD]/[Planned Cost Progress Basis RC PHD], BLANK()) | |
Hours Progress % PHD | Y | N | N | IF([Planned Hours Progress Basis PHD] > 0 , [Earned Value Hours Progress Basis PHD]/[Planned Hours Progress Basis PHD], BLANK()) | ||
Actual Cost PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ACTUAL_COST] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Actual Hours PHD | N | N | N | VAR LastBalanceDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ACTUAL_HOURS] ), 'REPORTING DATE'[ID] = LastBalanceDate ) | ||
Actual Rev PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ACTUAL_REVENUE] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Baseline Cost PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [BASELINE_COST] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Baseline Hours PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [BASELINE_HOURS] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Committed Cost PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [COMMITTED_COST] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Committed Hours PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [COMMITTED_HOURS] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Earned Value Cost PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [EARNED_VALUE_COST] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Earned Value Hours PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [EARNED_VALUE_HOURS] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Estimated Cost PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ESTIMATED_COST] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Estimated Hours PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ESTIMATED_HOURS] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Estimated Rev PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [ESTIMATED_REVENUE] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Planned Committed Cost PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_COMMITTED_COST] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Planned Committed Hours PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_COMMITTED_HOURS] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Planned Cost PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_COST] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Planned Hours PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_HOURS] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Planned Rev PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PLANNED_REVENUE] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Posted Rev PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [POSTED_REVENUE] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Preliminary Rev PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [PRELIMINARY_REVENUE] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Scheduled Hours PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [SCHEDULED_HOURS] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Scheduled Work PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [SCHEDULED_WORK] ), 'REPORTING DATE'[ID] = LastReportingDate ) | ||
Used Cost PHD | N | N | N | VAR LastReportingDate = MAX ( 'PROJECT HISTORY DETAILS PHD'[DIM_REPORTING_DATE_ID]) RETURN CALCULATE ( SUM ( [USED_COST] ), 'REPORTING DATE'[ID] = LastReportingDate ) |
Time based measures are calculated in the cube with respect to other measures. The table below defines the meaning/definition of the different time measures. These measures need to be used with a specific time dimension hierarchy [REPORTING_DATE].[RepDateMFHy].
Measure | Meaning |
YTD |
Aggregated value for current month in current year. E.g.
for period 202010 Ytd represents sum of periods 202000-202010. |
R12 |
For a given period, the sum all months from one year back up to the
previous month. E.g. Rolling 12 for 202010 is the sum of months 201910
- 202009 |
PY |
Previous Year The value of the corresponding month one year back. E.g. for month 202010, the value of month 201910. |
YTD PY |
Year to Date Previous Year Aggregated value for corresponding month one year back. E.g. for month 202010 YTD Previous Year represents sum of months 201901-201910. |
R12 PY |
Rolling 12 (completed) Months Previous Year For a given month, first going one year back, then taking the sum of all months from one (more) year back up to the previous month. E.g. for month 202010 the sum of month 201810-201909 |
Avg XXX Ytd | Sum XXX YTD/Count XXX YTD |
Avg XXX R12 | Sum XXX R12/Count XXX R12 |
XXX % YTD | Count XXX YTD/Count YYY YTD |
XXX % R12 | Count XXX R12/Count XXX R12 |
Model Name |
The data source for this object is defined using IFS Developer Tool. Further Transformations are done using Power BI.
Additional information can be found in the online documentation of Information Sources.
Model Table | BI Access View | Referenced Information Source | Recommended Access Type |
PROJECT HISTORY DETAILS PHD | FACT_PROJECT_HISTORY_LOG_PQ_BI | FACT_PROJECT_HISTORY_LOG_PQ | On Line |