Model: Project - Specifications for Fact Table: PROJECT ACTIVITY PERFORMANCE ANALYSIS

On this page you will find the specifications regarding the Model: Project and Fact Table: PROJECT ACTIVITY PERFORMANCE ANALYSIS.

This model dimension represents a model specific dimension based on the IFS Cloud fact FACT_ACTIVITY_CALCULATION. The dimension is based on a fact and there is no corresponding dimension in core.

Attributes

Attribute Description (where applicable)
Fact Project Activity Performance Analysis IDProject Activity Performance Analysis ID
Activity Seq KeyRepresents the Activity Sequence Key of the fact

Measures (table to be generated as far as possible)

Aggregation of measures is based on SUM if not explicitly noted.

This section describes the basic measures in the cube. These are either measures defined in the core Information Source, in the model itself or in the ETL process. The columns have the following meaning:

Measure Calculated Y/N Contains Time Intelligence Y/N Definition/Note (where applicable) Aggregation Type Hidden Y/N Measure Expression
Actual vs Scheduled % RCNYReporting Currency calculationNIF([BCWS RC] > 0, [ACWP RC]/[BCWS RC], BLANK())
CPI RCNYReporting Currency calculationNIF( [ACWP RC]>0, round([BCWP RC]/[ACWP RC],2),IF( [BCWP RC]>0, 1 ,BLANK()))
SPI RCNYReporting Currency calculationNIF( [BCWS RC]>0, round([BCWP RC]/[BCWS RC],2),IF( [BCWP RC]>0, 1, BLANK()))
ACWP RCYYNSUM([REP_CURR_ACWP])/[Currency Rate]
BAC RCYYNSUM([REP_CURR_BAC])/[Currency Rate]
BCWP RCYYNSUM([REP_CURR_BCWP])/[Currency Rate]
BCWS RCYYNSUM([REP_CURR_BCWS])/[Currency Rate]
CV RCYYReporting Currency calculationNSUM([REP_CURR_CV])/[Currency Rate]
EAC RCYYReporting Currency calculationNSUM([REP_CURR_EAC])/[Currency Rate]
ETC RCYYReporting Currency calculationNSUM([REP_CURR_ETC])/[Currency Rate]
IEAC RCYYReporting Currency calculationNSUM([REP_CURR_IEAC])/[Currency Rate]
IETC RCYYReporting Currency calculationNSUM([REP_CURR_IETC])/[Currency Rate]
IVAC RCYYReporting Currency calculationNSUM([REP_CURR_IVAC])/[Currency Rate]
SV RCYYReporting Currency calculationNSUM([REP_CURR_SV])/[Currency Rate]
VAC RCYYReporting Currency calculationNSUM([REP_CURR_VAC])/[Currency Rate]
Actual vs Scheduled %YNNIF([BCWS] > 0, [ACWP]/[BCWS], BLANK())
CPIYNNIF( [ACWP]>0, round([BCWP]/[ACWP],2),IF( [BCWP]>0, 1 ,BLANK()))
Completed Activities %YNNIF([Count Activity]>0, [Count Completed Activity]/[Count Activity], 0)
SPIYNNIF( [BCWS]>0, round([BCWP]/[BCWS],2),IF( [BCWP]>0, 1, BLANK()))
ACWPNNNSUM([ACWP_COL])
BACNNNSUM([BAC_COL])
BCWPNNNSUM([BCWP_COL])
BCWSNNNSUM([BCWS_COL])
CVNNNSUM([CV_COL])
Count ActivityNNNSUM([COUNT_ACTIVITY])
Count Cancelled ActivityNNNSUM([COUNT_CANCELLED_ACTIVITY])
Count Closed ActivityNNNSUM([COUNT_CLOSED_ACTIVITY])
Count Completed ActivityNNNSUM([COUNT_COMPLETED_ACTIVITY])
Count Late Planned ActivityNNNSUM([COUNT_LATE_PLANNED_ACTIVITY])
Count Late Released ActivityNNNSUM([COUNT_LATE_RELEASED_ACTIVITY])
Count Planned ActivityNNNSUM([COUNT_PLANNED_ACTIVITY])
Count ProjectsNNProject Currency calculationNDISTINCTCOUNT('PROJECT ACTIVITY PERFORMANCE ANALYSIS'[DIM_PROJECT_ID])
Count Released ActivityNNNSUM([COUNT_RELEASED_ACTIVITY])
EACNNNSUM([EAC_COL])
ETCNNNSUM([ETC_COL])
IEACNNNSUM([IEAC_COL])
IETCNNNSUM([IETC_COL])
IVACNNNSUM([IVAC_COL])
SVNNNSUM([SV_COL])
VACNNNSUM([VAC_COL])

Time Intelligence Measures

Time based measures are calculated in the cube with respect to other measures. The table below defines the meaning/definition of  the different time measures. These measures need to be used with a specific time dimension hierarchy [REPORTING_DATE].[RepDateMFHy].

Measure Meaning
YTD Aggregated value for current month in current  year. E.g. for period 202010 Ytd represents sum of periods 202000-202010.
R12 For a given period, the sum all months from one year back up to the previous month. E.g. Rolling 12 for 202010 is the sum of months 201910 - 202009
PY Previous Year
The value of the corresponding month one year back. E.g. for month 202010, the value of month 201910.
YTD PY Year to Date Previous Year
Aggregated value for corresponding month one year back. E.g. for month 202010 YTD Previous Year represents sum of months 201901-201910.
R12 PY Rolling 12 (completed) Months Previous Year
For a given month, first going one year back, then taking the sum of all months from one (more) year back up to the previous month. E.g. for month 202010 the sum of month 201810-201909
Avg XXX Ytd Sum XXX YTD/Count XXX YTD
Avg XXX R12 Sum XXX R12/Count XXX R12
XXX % YTD Count XXX YTD/Count YYY YTD
XXX % R12 Count XXX R12/Count XXX R12

USED BY MODEL(S)

Model Name

Data source Information

The data source for this object is defined using IFS Developer Tool. Further Transformations are done using Power BI.

Additional information can be found in the online documentation of Information Sources.

Model Table BI Access View Referenced Information Source Recommended Access Type
PROJECT ACTIVITY PERFORMANCE ANALYSISFACT_ACTIVITY_CALC_PQ_BIFACT_ACTIVITY_CALC_PQOn Line