Work guidelines are instructions or notes associated with the manufacturing process, either through the product structure or the routing of the part being built.
Used with components in structures, they allow you to create an artificial routing (if you do not use routings). They also give specific or additional information to the assembler or stockroom manager when he/she picks material for an order. Work guidelines warn you about the hazards or special handling properties of the material being used.
Used with disassembly components in structures, they allow you to describe how the component should be disassembled, when it must be scrapped, and the relevant position reference.
Used with routings, they allow you to give step by step instructions about performing an operation. Additionally, they provide a standard location to store inspection, safety info and machine program parameters.
For routing guidelines, it is possible to define a guideline type. Possible
values are Instruction, Machine Instruction, and Subtask. The difference
between Instructions, Machine Instruction
and Subtask guideline type is that a subtask may require a signoff or
inspection which an instruction or machine instruction does not require. If
a signoff is required then it indicates that the subtask must be signed off
before the operation can be completed by the shop floor worker. It is not possible
to report any operation quantity complete for the shop order before all subtasks
related to the operation guidelines are signed off. Machine instructions
are used to send a machine related instruction that is relevant to
a routing operation using Manufacturing Execution System (MES).
It is
also possible to include an inspection sign off for a subtask. Possible values
are Required to Close Operation and Required to Close Shop Order.
This means that an inspector must approve the work performed in order to
complete the subtask. Depending on the value of the sign off subtask, it is
not possible to report a quantity on the operation or receive any shop order
quantity into inventory before the subtasks that require inspection sign off
are signed off by the inspector.
It is possible to define an Employee Qualification Profile for a subtask. If an Employee Qualification Profile is added, the subtask needs to be signed off. If a validation against the employee qualifications and the qualification profile will be done, depends on the option selected for Consider Qualification Profile list, in Site/Manufacturing. The functionality is limited to the subtask sign off in employee reporting mode on the shop floor workbench.
Work guidelines can either be created manually or from a work guideline template. Work guidelines are associated with structure line items or routing operations. When a shop order is created, the work guidelines for the structure used on the order are copied to the order’s materials. The work guidelines for the routing used on the order are copied to the order’s operations. You can modify these material and operation guidelines without affecting the structure or routing guidelines that generated them. The structure and routing guidelines can be modified without affecting the work guideline templates that created them.
Altern.-Arbeitsplan
Alternative/Variantenstückliste
Arbeitsgang/Arbeitsplan
Arbeitsgangrichtlinien für Arbeitsplanvorlage
Arbeitsgänge
Arbeitsplan
Arbeitsplan - Arbeitsrichtlinie
Arbeitsplan Arbeitsrichtlinie
Arbeitsplanalternativen
Arbeitsplanvorlage
Arbeitsrichlinie DOP-Komponente
Arbeitsrichtlinie für Stückliste
Arbeitsrichtlinien Fertigungsauftrag Demontagekomponente
Arbeitsrichtlinien Lieferobjekt
Arbeitsrichtlinien für Arbeitsplan
Arbeitsrichtlinien für Stückliste
Arbeitsrichtlinien für Stücklisten
Arbeitsrichtlinien/FA Arbeitsgang
Arbeitsrichtlinien/FA-Material
Komponente Produktstückliste
Komponente/Variantenstückliste
Produktstruktur
Produktstücklistenalternative
Rezeptur
Rezepturalternative
Rezepturkomponente
Variantenstückliste
Vorlagen Arbeitsrichtlinien
BDA für Stückliste/Arbeitsplan
Konfigurationsstruktur abschließen
Produktstruktur abschließen
Arbeitsplan abschließen